April 21, 2025

Athens News

News in English from Greece

For the sake "Green agenda" In Germany, they blew up the most modern coal power station in Europe


The Moorburg power station was commissioned in 2015, cost 3 billion euros and produced a capacity of 1654 MW, providing energy with energy Hamburg – The most populated nestless city in the European Union.

The station worked for only six years. In 2018 Greta Tunberg I arranged a action at the walls of the station, and in 2021 Moorburg stopped. Work on demolition of the power plant has been underway for a year and a half.

Preview

In November 2024, they blew up a two -pipe chimney 140 meters high, and now they had to demolish boiler houses: the first was successful, but the second resisted, because one of the main explosive charges did not detonate.

But that's not all. As part of the fight against a rational approach to the transition to renewable energy sources only over the past year, Germany Closed 16 coal power plantsand a year earlier the last three nuclear power plants were closed: ISAR 2 in Bavaria, Neckarwestheim 2 in Baden-Württemberg and Emsland in Lower Saxony.

However, now in Germany, a course for militarization is scheduled, and for this it is necessary to provide energy resources of the energy-consuming military industry in order to have time to prepare for the beginning of the predicted military operations with Russia in 2027-2030.

Obviously, only the energy of the Sun and the wind will not be enough for this, so the new government of Germany will consider the transfer of the implementation of the “Decarbonization plan” and the rejection of coal from 2030 to 2038.



Source link

Verified by MonsterInsights